|
|
 |
|
 |
|
 |
| Drill pipe racked in foreground of Rig 100 |
|
Drill pipe ready for V-door at Jolokia 1 |
|
A night view of steam at Habanero 3 March 2008 |
|
Habanero 3 well head March 2008 |
|
|
|
|
|
|
|
 |
|
 |
|
 |
|
 |
| Innamincka Town Common on the Cooper Creek |
|
Kicking up dust at Jolokia 1 March 2008 |
|
Rig 100 at Jolokia 1 March 2008 |
|
Adjusting the top drive at Jolokia 1 pre-spud |
| |
|
|
|
|
|
|
 |
|
 |
|
 |
|
 |
| Approaching the township of Innamincka |
|
Casing at Jolokia 1 |
|
Dawn at Jolokia 1 |
|
Drill pipe and casing racked and ready at Jolokia 1 |
|
|
|
|
|
|
|
 |
|
 |
|
 |
|
 |
| Man at Habanero 3 during flow testing |
|
Rig 100 Dog House |
|
Easternwell drilling team at Jolokia 1 |
|
Rig 100 mast and moon |
| |
|
|
|
|
|
|
 |
|
 |
|
 |
|
 |
| Rig 100's top drive |
|
Steam flow at Habanero 3 during the rainbow dawn March 2008 (7) |
|
Steam flow at Habanero 3 March 2008 (2) |
|
Rig 100's V-door |
| |
|
|
|
|
|
|
 |
|
 |
|
 |
|
 |
| Steam flow at Habanero 3 March 2008 |
|
The drilling floor of Rig 100 pre-spud |
|
The gibber plain approaching the town of Innamincka |
|
Venus shines on the steam flow at Habanero 3 March 2008 |
| |
|
|
|
|
|
|
 |
|
 |
|
|
|
|
| Welding at Jolokia 1 |
|
A man works with the steam flow at Habanero 3 March 2008 |
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|